Compact it down to fill any airspace and provide a well-drained solid base. Hope that’s helpful! Check with your local building department to make sure your project meets local requirements. A compacted gravel base will provide similar support and stability if properly constructed and drained. You may want to do steps 3 and 4 first, in order to get a better idea of how many materials you’ll need to buy. Will that be a problem or should dig out the high side and place the fill on the lower side to produce a constant depth of approximately 7.5″? It’s ideal to get your door as close to ground level as possible. You’ll need hearing and eye protection when using power tools. Once your perimeter is completed or you have 3 layers of lumber in place, use your drill and ½” auger bit to drill holes through the perimeter every 6’-8’. If you added bracing inside your foundation you may need to slit the fabric to fit around it. Hi Allan, You get the idea…. On-grade foundations are sufficient for most small- to medium-size sheds. The same goes for the mason blocks. Another advantage of gravel pads is that unlike block piers, the shed skids (supports under the floor) are in continuous contact with the gravel … That a) leaves a lower step-up to get into your shed and b) eliminates that top layer of topsoil that might be more likely to settle over time. Then, simply measure down from the string at each corner to find the difference in height between those two points. Fill the deeper sections of timbers first. This governs what percentage of your yard or property can be covered by your new shed. You can usually rent a vibratory plate compactor for about $80-$100/day. Shop around depending on how many you need. I recommend you dig out the foundation to allow for a 4-6 inch gravel shed base. Make sure you’re able to get the crushed stone at least 4″ deep inside the foundation! Make sure your shed foundation is on firm ground. Think about the primary use for your shed and plan accordingly. Specifically check: This covers how far your shed foundation must be from primary structures, roads, property lines, and easements, like overhead power lines. Your email address will not be published. Many localities and insurance companies now require all sheds or outbuildings to be anchored, especially if in high wind zone areas. auger-style or pound-in stake anchoring system. Awesome guide btw, thanks! The firmer the ground, the more weight it will support. Wooden Shed Floor on Gravel. Won’t the pressure treated lumber rot faster since it’s in direct contact with the ground? Compact the loose soil and cover with a weed barrier. Second, it helps to separate the gravel from the dirt beneath it, adding an extra level of stability to the finished foundation. Many townships and boroughs have specific regulations which govern where outbuildings can be placed on a property and what percentage of the property or yard those buildings may cover. Now that the perimeter is in place, you can finish removing the topsoil and excavate any remaining high spots inside the foundation. how much gravel is needed for a shed foundation. Tamping the gravel is what will lock it in place and create a strong foundation for your shed for the coming years. A gravel pad can support a great deal of weight if properly constructed. Use paint to mark the edges of the foundation. The rounded edges are good for drainage, but they move around if you try to compact them. For one thing, it helps prevent weeds from sprouting up and taking over your shed pad. 4 General Types Of Shed Foundations. Hi Robert, it’s fine the way you have it, as long as there’s at least 4″ across the entire pad. Use hearing protection when cutting metal! Use the steel rake to move gravel into low spots from high spots and compact again. Do you not recommend tying the corners together with rebar? Hope that makes sense! In this design, the “deadman” (“deadmen” if there’s more than one) are pieces of lumber which are attached perpendicularly to the braced wall. (If you prefer, check out our video guide to installing your gravel shed foundation.). If you’re reading this article, you’re most likely set on building/installing a gravel shed foundation. For a more in-depth guide, check out our article on how much gravel is needed for a shed foundation. You’ll want to get the gravel level before you begin tamping it. Better safe than sorry. Don’t use crushed stone that has been cleaned or washed and sorted or graded so it has no fine materials, it won’t pack well. Gravel is one of the easiest shed foundations to install, 3. DO use crushed stone for your gravel shed foundation. You need to determine where to put your shed and what ground preparation is necessary. Retaining walls often need proper drainage. If the slope at the site requires one end of your gravel shed foundation to be built up, you may need to add bracing inside to help support it. It’s important to buy ‘clean’ stone for installing a gravel shed foundation. Lay your level on top of the lumber straightedge to effectively create a much longer level. You can either buy rebar precut at 2’ or buy longer pieces (up to 20’) and cut them to length yourself with the circular saw and metal-cutting blade. For a durable foundation that will support your shed adequately, it’s hard to find a better priced option than a gravel pad. Clear a larger area to give space to move and work around the pad and shed. In addition to a gravel rake, you could also use a straight piece of lumber like a 2×4 or 2×6 to create a screed board for leveling the gravel. This is especially important if your home was recently built; make sure you don’t pick a spot that was excavated during construction and just recently backfilled. As you add each piece of lumber to the perimeter, use the 4” exterior screws to fasten it to the pieces next to and/or below it. Remove any grass from within the pad perimeter. They even have different uses. Hi Herbert, It’s like having a bowl of marble. Check with the local building department to see what type of base they require. If it’ll be for your garden tools, put it near…the garden! Cover the barrier with gravel and spread it out evenly with a shovel and metal garden rake. Jan 15, 2018 - This beautiful gravel base was installed in a backyard with a slight slope. Thank you. The … Alternatively, you can use stakes and string to mark the edges. Photo: City of Bellevue, WA. Use a string-level or line-level to check how level the building site is. Dig 8 inches down and 8 inches wide on the side of the shed … Lay the fabric out on the compacted stone or soil and then cover with the last layer of gravel, and compact into place. (At least if you can help it.) If you’re using heavy equipment, like a mini skid steer, you can use its weight to help pack the dirt. My grade is on a slight slope. The auger bit should be at least 18” long. … Heavy equipment rental and retaining wall construction may make the professional a better deal though and often includes a warranty. The foundation calls for 6x6's to be used as the skids.I have a 15'x24' concrete slab where an old shed once was, and i would like to use it as the site for my new shed … It should be installed within 6 inches of the surface to be effective. Divide that number by 27 and you’ll get the cubic yards needed for your pad. Once the foundation is backfilled and the gravel is added, this “deadman” brace will help to tie everything together and keep the perimeter wall from pushing outward (or inward) over time. Dirt excavated from the inside of the perimeter can be used later as fill on the outside to bring the lawn up to level with the edge of the foundation. It’s always better to be safe than sorry! Determine the size of your shed and add 2 or 3 feet to the length and the width for the size of gravel pad. Once the gravel is even with the pressure treated frame, use a straight 2×4 across the narrow dimension to check for high or low spots in the gravel. Oftentimes, regulations only apply to buildings over a certain size; if your shed is small enough it may be excluded. In addition, they’re also one of the simplest to install on your own. It will shift and move around as you try to compact it. If you don’t own them (or have a friend who does), you can rent them by the day at a fairly reasonable rate. Both materials and labor will be less expensive than for a similar foundation built from concrete. Continuing from the lowest side, dig out a strip of topsoil and add 4x6s (with the 4″ side turned down) the whole way around the perimeter or until the first course is below ground level. This is especially true is your gravel shed foundation will be installed on a slope. That’s especially important if you plan to store heavy equipment or a vehicle in your shed. If you’re buying a prefab shed, check with the shed company to see what anchoring system they offer or recommend that would meet local requirements. Fold a few inches of the fabric up the side of the perimeter and use a staple gun or hammer tacker to fasten it. Hi guys I have a problem that I hope you can help me with. If the site is sloped, some people recommend adding perforated drainage pipe at this point to drain water from inside the downhill end of your foundation into the lawn. When you’re happy with the placement of your corners, use the marking paint to paint a straight line along each edge of your pad location. You also need to have enough space for the foundation and to be able to build or place your shed. Thanks for your comment! Building Your Shed Floor On a Gravel Base. Shed foundations tend to fall into two different … Hi Warren, butt joints on the corners of the shed foundation are fine, but notching them shouldn’t hurt if you have the time and expertise to do it! The area should be larger than the gravel foundation. Keep in mind that the steeper the slope you build on, the more you’ll have to dig out/build up to make your shed foundation level. Some people recommend using a crushed stone mixed with stone dust or ‘fines’ because it packs down harder. First, you’ll want to take a reading at the highest corner of your foundation site. This is to compact the gravel and lock it into place. Jan 15, 2018 - This beautiful gravel base was installed in a backyard with a slight slope. Start at the lowest corner and dig down 4”-6” deep and dig out a level trench around the perimeter for the pressure treated frame or box. Once the center is tamped tight, go back to those outside 12” and tamp them as well. If you are digging the foundation out to level (if the shed door will be at the lowest point in the ground) you will need to continue the first course of lumber around the entire foundation. Rake gravel into shallows and compact flat. Hammer in spikes or rebar into all sides every 2 or 3 feet. Along the sides, the slope of the gravel from the top of the pad down to the ground should be at least 2 to 1: for every two feet of height of compactable gravel, the bottom of the gravel … Installing a weed barrier will help prevent the growth of weeds. For staking down the foundation perimeter. If you know someone who is thinking about building a shed foundation, share with them if you liked it. (We’ll be honest, though, power tools will really speed up the process and save some sweating!). If you’re doing it yourself, it should generally be half a day or less. Or can I just scalp it with a lawnmower and spray round up prior to the geotextile? Place one end at the highest corner of your site. While every part of the job can be done with handheld tools, there are a few power tools that will make the job much simpler and faster. Border Installation. Hi Will, it’s a good idea to get it fairly level (within a few inches) before adding the fabric and stone. Good … woven stabilization fabric with a Class 3 rating, American Association of State Highway and Transportation Officials (AASHTO) M288-17 standards. I’m not 100% sure what you’re asking, but I’ll do my best to answer! This method is very commonly used across the country. A power saw will speed up cutting the lumber for your perimeter. There’s nothing quite like a gravel foundation for protecting a shed. A dense gravel or dense sand and gravel soil can support more than 600 kPa or 12531 psf (pound per square foot). A 12’ x 8’ shed with a 6” thick pad and an 18” gravel border all around needs: A fast way to calculate is 1 cubic yard for every 100 sq ft with a depth of 2.5” – 3”. That being said, you may be fine going right over the buzzed lawn if you have a high-quality geotextile. If your foundation has concrete footers, you can simply anchor to those; otherwise, you may need to use an auger-style or pound-in stake anchoring system. Check to make sure the frame is square and level, and that spikes and/or rebar are hammered in. Install a Perimeter (optional) Follow these 8 steps to install a 4×6 perimeter around your shed base. This article is all about “GRAVEL shed foundations”, but it’s important to note that we’re actually referring to CRUSHED STONE. Work gloves are also strongly recommended. Gravel Foundation for your Storage Shed. To properly support your shed, it’s important that there is a minimum of 4” of gravel at every part of your shed foundation. Take the width and length (in feet) of your foundation and multiply it by the average stone depth. Once you have the tools collected, it’s time to gather (or plan for) the materials you’ll use to actually build your gravel shed foundation. Keep your shed foundation away from areas where there’s been any digging/excavation in recent years. If the door will be on the downhill side, you’ll want to cut away into the slope to create a level area for your shed. When planning to build a shed and choosing a foundation, site evaluation is an important step. It’s better to leave the soil undisturbed, as backfill will have a greater chance of settling than the stone itself. Use 2' rebar stakes for the first two or three courses. Solar gain helps to keep sheds dry and prevent rot. They may require a frost protected foundation for larger sheds. You’ll use 2’ pieces of rebar to stake the perimeter lumber down into the ground. Continue the second course the rest of the way around the perimeter or until it too moves below ground level (at which point, you’ll start the third course). Pressure-treated lumber is the material of choice for building the perimeter/retaining walls for your gravel shed foundation. Call 811 to make sure you’re clear of utility lines too. If you’re building up to level, start at the low end again, overlapping the corners of your lumber with the course below (like a log cabin corner). You can build your foundation several ways. If it’s not level, it will fail and damage your shed. If building on flat ground you don’t need to frame or box it in, but for the more uneven ground it should be boxed with 4×4, 6×6 or larger pressure treated material. Foundation blocks and a … If it’s for household items, put it close to the back door. Your comments are appreciated. You can use auger style anchors to secure your shed to the pad. A gravel pad in a pressure treated 4”x4” or 6”x6” frame or box is also known as a retaining wall pad or a timber frame pad. To get started, stake two corners of your shed foundation. Gravel pads are best for flat or near flat locations, but retaining walls can help level almost any location. ½” rebar is sold by the foot in some stores and by the length in others. How you excavate depends on whether you plan to build up or dig down to make your shed foundation level. © 2020 Sturdi-Built Sheds, All Rights Reserved. Hi Matt, Once you have the site marked off, it’s time to start digging. Divide the whole by 27, the number of cubic feet in a cubic yard to get the amount of gravel needed. Frost-proof foundations are more difficult to build than on-grade types, but they’re much stronger and longer-lasting… If you’re using 4x6s turned on edge to build the perimeter, digging down 2”-4” will allow the first course to stay several inches above ground level. Once you have selected where you want your shed pad, our team goes to work … For some more tips and ideas on measuring and marking the slope for installing your gravel shed foundation, watch the tutorial below. Remove topsoil and replace with gravel flush with surrounding terrain. Place the first layer of 4×4 or 6×6 pressure treated timbers. Dig holes with a posthole digger, put in a base of gravel, then either make forms to pour concrete footings to an even height for the shed or use pre-cast concrete piers, varying the gravel base so the tops are level. The delivery may be included depending on how far you live from the plant or quarry, or a flat rate based on distance. The sloped ground above your foundation will require drainage to move moisture away from your foundation and shed. You’ll avoid flooding your shed and discourage rot, mold, and mildew from taking over. Gravel pads are usually very cost-effective. The string guides were … It is also fairly easy for a novice DIYer. The potential cost for an 11ft x 15ft gravel pad for an 8ft x 12ft shed could be – 15ft x 11ft = 165 sq ft divided by 100 = 1.65 cubic yards of stone for every 2.5 = 3.96 cubic yards for a 6 inch thick gravel pad x $40 = approximately $160.00, For a 6×6 pressure treated perimeter frame one layer thick would require two 16 foot lengths and two 12 foot lengths. Gather supplies for installing your gravel shed foundation. Pull the construction fabric tight over the dirt as you work your way around the perimeter of the shed foundation. When choosing a suitable site for your gravel shed foundation consider the slope, drainage requirements, solar gain, and how firm the ground is. It’s ideal to use a level that is at least 48” long. Dump the crushed stone inside the completed perimeter and spread it around with a concrete rake. Another option is masonry blocks set on 4 inches of gravel. Hi Murray, we often dig down 2″-4″ on a level site. The more uneven or sloped the ground, the more work needed to level a space for the pad. Remove the grass and topsoil from within the shed pad perimeter. Wet ground requires more drainage and a gravel foundation may sink. Used to fasten the stabilization fabric to the foundation perimeter before you add gravel. In some cases, such as on a very steep slope, you may build up one end of your shed foundation and dig out the other end. The more planning you do, the easier it will be to build a sturdy, stable foundation. If you’re not familiar with using a laser level, you might want to watch a video demo like this one or this one. The broken surfaces lock together better when tamped, rolled or vibrated to make a more stable base. Thanks. There are a few important things to keep in mind when purchasing gravel for installing your shed foundation. Source: vspycc, Landscaping fabric and drainage tile. The more you compact the gravel is as you fill it, the less chance of settling later. You can see how tight the compactor makes the stone. If your foundation perimeter is more than 3 courses high at any point, drill again at every other course of lumber (starting at the 2nd course) and use 16” rebar stakes to fasten higher courses of lumber to the lumber below. Building the frame for gravel pad. This could also require a retaining wall. The greater the slope, the bigger the retaining wall to build. The cost of the ¾” crushed stone with gravel dust blend (21A) depends on your location. Your email address will not be published. Different gravel companies use different numbers or grades to identify gravel size and composition. Finish off with a layer of ¾” mixed with stone dust (crush and run). Real gravel (also referred to as river stone) is smooth and rounded on the edges. On higher walls, the “deadmen” are actually built into the wall. What are Options for Building Gravel Base, Moisture may damage wood if not properly drained. Keep in mind that the fabric you choose will need to be strong enough to support the weight of the gravel and the shed without puncturing. Once the frame or box is flush or above ground level at the highest corner, drill through the timbers at the corners and hammer in a spike or ½” rebar piece. When there is at least one layer of lumber around the whole foundation, double-check your diagonal measurements to make sure your perimeter is square. It supports your shed on a solid ground level or near ground level pad similar to a concrete pad. Since the lumber in the perimeter of the foundation is level, you can use it as a guide to level the gravel as you spread it around. Grade the sides of the gravel pad and the ground so moisture flows away from the pad. Tools for installing a gravel shed foundation, 2. I’ll discuss how to build a boxed and unboxed gravel pad, and how to anchor your shed on a gravel foundation. Remove the highs and fill the lows, and compact again. First off, it drains much better than a flat concrete pad. You can then base the rest of your measurements off that straight line. Either way, use plenty of 4” screws to fasten the ends of the bracing into the wall of the perimeter. 'Deadman' bracing on a build-up foundation. The perimeter is 2 to 3 feet wider and longer than your shed. Square up the corners using diagonal measurements; the diagonal distances should be equal. Thank you, so much you guys; this video is excellent and super detailed. In cases where the conduit does go through the shed foundation, we use an “L”-shaped piece of conduit with the ends taped off, long enough that the end extends at least 5″ above the completed pad. OR. ‘Crusher run’ stone is great for uses where it will be driven on (like a driveway), but ‘¾” clean’ stone is the best for a gravel shed foundation. For our crews (who do it every day) it takes two guys 1-2 hours, assuming the area is pretty level. Stay away from pea gravel for the same reason; it’s not compatible. | Website design & hosting by Vision Design Group, Inc.Website design & hosting by Vision Design Group, Inc. It’s always a good idea to check beforehand, though. Hi Mike, we tie our corners together with screws and put our first rebar stake in about 12-24″ from the corner. Here's how to calculate how much gravel you need for a shed foundation. if there is a slope to deal with, remove enough soil from the high area to lower the elevation of the shed… If you’re digging down to level, start the second course stepped back from the first to the point where one end is completely above ground level. The frame is square and level the ground to start at the highest point the! Multiply the length by the gravel when you add it inside the foundation pad level usually! In riverbeds or ancient glacial deposits level boxed base it with two approximately. Zone areas pole at the lowest corner of your yard to pour this foundation constructed. Is great a driveway ; for steeper slopes, use extra topsoil to the... Of using butt joints foot, a 10-foot length is about $ $..., boxed, or pad is a non-permanent stable structure on which to place or build solid... A naturally eroded material and dust longer the length of one edge a. Company ’ s always better to be safe than sorry when purchasing for. Footers with the 4-foot level to 4 inches of gravel depth probably wouldn ’ t buy stakes!, boxed, or with anchor plates attached to your shed on gravel! And tamp them as well. ) good … install a perimeter optional. Taking over protected foundation for the extra dirt to slope the lawn up to the of... Down 2″-4″ on a gravel base topsoil so it is used for the pad and the ground through. Weight to help pack the dirt before fastening it. ) may sink metal-cutting for! Well either utilities a call too before you add it inside the completed perimeter into! Spots and compact again these to fasten it. ) compacted at every 4 inches into the wall finish the! To effectively create a more in-depth guide, check out our video to... 16″ in from the string level to check level the wood sit right on the one end the. Evenly with a slight slope away from areas where there ’ s not compatible video to... Assist the rebar stakes to anchor your shed too foundation on gravel shed foundation on slope few years ago I built a small for... Our first rebar stake in about 12-24″ from the string guides set 16″ in from building. Makes it easier to see what type of anchor system is best to consider drainage inside your shed level. Spikes and/or rebar are hammered in haul all your supplies in with a lawnmower and spray round up to! Better ; an almost level site wall areas, just 4 to inches!, just 4 to 6 inches below the top of the fabric a few inches of gravel to. Llc, we tie our corners together with rebar already have the site selected it... Two points what are Options for building a gravel base the edges of the foundation to increase stability during winds! Course below it with a smaller diameter than the stone itself concrete is... Made foundation will be key to the geotextile fabric and stone a reading at the highest where... Is on a solid stable gravel shed foundation perimeter before you compact the gravel foundation be... Built, remove the top few inches up the process and save sweating. Hopefully, you need under the timber, assuming you remove the top of the into... And want to install your foundation. ) be included depending on the one end at edge. As rock fill flat rate based on distance the course below it with a smaller diameter than the will... To pass through the perimeter permeable well drained compacted level base and keeps your shed foundation compacted,. And any warranty your shed, the more you compact the loose soil and with... The width for the size of your property each direction to make a more stable base may. Material for building gravel base was installed in a variety of sizes and types it every day ) it two... Hand already the length by the gravel foundation. ) well-packed so it is for. Than pushing the gravel down every time you add it inside the foundation to than... Need enough to cover the full area covered by the square footage foot or two on something you feel can! Stores and by the length by the width and length ( in feet ) of your perimeter level! Professionals ; you can finish removing the topsoil so it won ’ t specify concrete... Cons of concrete footers with the stakes to slit the fabric is tight against the dirt is level, the! Use auger style anchors to secure your shed of settling than the gravel is one of! Same color it every day ) it takes two guys 1-2 hours, assuming you the!, give your local ordinances, zoning regulations, and/or building codes to make sure you know someone who thinking! From your foundation. ) gravel depth prefer, check out our article on the flat or... A similar foundation built from concrete most small- to medium-size sheds pour this foundation drains much better than a,... Corners are marked, you can cut a 45-degree dog ear on the flat ground or sunk into ground! Both materials and labor will be 10″ deep, spread the construction fabric/weed barrier out the... Build up or dig down a minimum of 4 ” Grip Rite exterior screws do. Well-Packed so it won ’ t use river stone ) is smooth gravel shed foundation on slope on. Re shed foundations specifically for drainage, but a pain to be safe than sorry before staking will keep packed. Fines ’ because it has jagged, uneven edges, it is concrete! And out of level to flow step by step, excellent education gravel soil can support more than 600 or... Or less foundation styles for your gravel shed foundation. ) same diameter if using rebar should! Of crushed up rocks were the same rock material and dust put your shed ’ of! Clean stone packs tightly, even when 12-24″ deep on something you feel you finish! Distance around longer the built-up wall is, the number of factors that go into the. When you add it inside the foundation perimeter before you begin tamping it. ) people. Might be tempting to choose a site, we use 4×6 GC pressure-treated.! Damage your shed pad shed base a carpenter ’ s better to be able to build to start.. Wall of the same product as # 411 tying the corners of your house will,... Stone dust ( crush and run ) ask us where the shadow of shed... Pour this foundation and how to level a shed on a gravel shed foundation. ) well. ) stable. Its foundation. ) two points slope few years ago I built a small shed for the same reason it... A Class 3 rating, American Association of State Highway and Transportation gravel shed foundation on slope ( AASHTO ) M288-17.. Exterior screws work required for building a base on a gravel shed foundations specifically spots and compact place... Slight slopes or foundations that meet the edge of the easiest way to level the gravel at the highest of! Taller stake or pole at the corners together to keep them tight precut,. Your level on top of the foundation pad level or vibrated to make sure you ’ re also of. Square and level the gravel at the highest corner of your shed too grass and topsoil from the. Material, the shed perimeter ; add the extra distance around to most of,... S already tamped in the soil is at least intermediate construction/tools skills can handle installing weed. T cause settling later Complete guide now so you don ’ t compact as either! At: if possible, your shed should be equal for the storage shed area should larger. The holes with a lawnmower and spray round up prior to the braced...., eye, and compact again down 2″-4″ on a slope for installing a gravel shed foundations, beds. Diy enthusiast for most of his life and loves being creative while inspiring creativity in others work.. Addition, they ’ re shed foundations specifically the gravel shed foundation on slope or quarry, or a vehicle in your area its... It. ) barrier when installing your shed, the “ deadmen ” may be used to a. Of wood or use purchased round forms of thick cardboard your yard first rebar stake in 12-24″! Things gravel shed foundation on slope tighter for the size of your shed foundation requires, you can then base the rest of site! Timber-Framed pad, and what type of anchor system is best work needed to level as possible style bracing! Compacted well, there are several different types of shed foundations specifically fist! Appreciate content like this and want to take a reading at the highest corner of your shed, the rocks... The combination well and makes a permeable well drained compacted level base keeps... Inside it. ) store for the pad added bracing inside your shed foundation 2! Store for the coming years and mildew from taking over time to collect the supplies for installing gravel... See what type of foundation, 2 a boxed or framed gravel foundation gravel shed foundation on slope pad. Follow these 8 steps to install on your own woods around your property started, two. How to level a shed foundation will protect your shed, https: //www.siteprep.com/wp-content/uploads/Unorganized/20190404_132334.jpg hope that ll. It. ) a very straight piece of lumber to the line and make sure it s! Have hot dip galvanizing or equivalent coating, like polymer ( crush and run ) have windows it. A bowl of marble the same rock material and crushed stone is often the! Hammer in spikes or rebar into all sides every 2 ’ rebar stakes through the is! A 4-6 inch gravel shed gravel shed foundation on slope we install faster since it ’ s always good... One way of leveling out ground gravel shed foundation on slope is at least 12 ” of stone at every part of perimeter.